Summary

Work Tracking

Maverick

Natty

Team Work - Detailed

Paul Larson (plars)

Progress:

  • Working on plan review presentation with James
  • Presented the QA portion of our plans for the Infrastructure/QA plan review
  • Added some additional detail to the patch tracking spec
  • Got a list of all our blueprints without owners for Ian
  • Brought another QA person on board this week, had initial discussions
  • Worked some more on scripts to automate detection and download of latest image and hardware pack
  • Discussed the tools we worked on last cycle with the Ubuntu Platform team
  • Worked on some unit test fixes for Abrek - should submit soon

Issues:

  • I need hardware - I have only a beagle c4 which will not even run all of the images successfully, and does not lend itself well to some things I'd like to try for automation
  • I might have a lead on getting a beagle XM, but a wider variety of the hardware we support would be useful

Plans:

  • More testing and automation work

James Westby (james_w)

Progress:

  • Public Plan Review.
    • Well received with >20 people listening.

    • Little feedback, which I take to be a sign that we have good plans for the cycle. Now it is about delivering on them.
  • Reviews of specs and code.

Issues:

  • Little time to work on the OverallStatusReporting spec.

Plans:

  • Work on the OverallStatusReporting spec.

  • Ensure that everyone has everything they need before I go on vacation.

Zygmunt Krynicki (zyga)

Progress:

  • Created two PPAs for releases and snapshots of launch control.
  • Pushed improved linaro-json package to a PPA.
  • Removed lc-tool from launch-control into a separate dedicated project launch-control-tools. Packaged that in a PPA.
  • Created new stable API for working with dashboard bundles and multiple formats. Packaged that in a PPA.
  • Almost finished working on JSON schema validation and dashbard bundle document IO usage in launch-control trunk. Patches should be in review queue on Thursday.
  • Started working on Reports application with very good progress. Should have a simple working demo for review by next Monday.
  • Helped Deepti to work on Launch Control

Plans:

  • Continue to work on the new reports application
  • Continue to decouple launch-control project into sub-projects (with sensible API and packages in a public PPA). This will make it much easier to use the existing technologies in new projects (see Ubuntu QA blueprint) and lower the complexity of hacking and deploying "the dashboard" in general.
  • Merge my !OpenID cleanup branch that has been waiting for several weeks, look for other branches that should be merged.

Issues:

  • I used up my PPA build quota yesterday ;-)

Michael Hudson (mwhudson)

Progress:

  • (arm-m-image-building-console)
    • "unify configs (config/lexbuilder.cfg, config/*.config, settings{,_devel,_production}.py) as far as reasonably possible"
    • "Fix deployment path. Currently deployed to /srv"
      • Hacking on lp:~mwhudson/bugsy/path-independence for this, depends on above branch.
  • (other-linaro-n-image-building)
    • "4.6 Multiple hwpacks": Made some progress, think I know how to do this now.
  • (other-linaro-n-infrastructure-our-own-offspring)
    • Created blueprint in Launchpad.
    • Helped Cody a bit with preparing a 'clean' offspring branch for open sourcing.
    • Convinced myself that setting up on intel only until pandas become available is a sensible option.

Plans:

  • (arm-m-image-building-console)
    • Hopefully cajole Cody into reviewing my config branch.
    • Get path-independence branch to a point where it's ready for review.
  • (other-linaro-n-image-building)
    • "4.6 Multiple hwpacks": Made some progress, think I know how to do this now.
  • (other-linaro-n-infrastructure-our-own-offspring)
    • Start scaring up some intel hardware.

Issues:

  • Reviews taking time due to access to external resources.

Guilherme Salgado (salgado)

Progress:

  • Reviewed ImproveLinaroMediaCreate, drafted work items for it and started working on them

  • Drafted work items for PackageDevelopmentTools

  • Helped Martin get started on l-m-c (linaro-media-create) development

Plans:

  • Continue working on ImproveLinaroMediaCreate, together with Martin

  • Wrap up discussions on PackageDevelopmentTools and update the spec

Deepti Kalakeri (deepti)

Progress:

  • Started looking into various blueprints/requirements that came out as the outcome of UDS
  • Spoke to Paul and Zygmunt discussed my interest in the Test results display on Launch control
  • Stared looking into django which is needed for the Launch control

Issues:

  • None to mention as of now.

Plans:

  • Work on the Launch control requirement as discussed with Zygmunt.

Mirsad Vojnikovic (mirsad)

Progress:

  • Test execution ongoing on latest daily builds (10.11) - learning about different things at the same time
  • Investigating possibility to automate build flash and test execution on STE HW

Issues:

  • None

Plans:

  • Continue with the same
  • Investigate STE releases to Linaro and make test plan

Spring Zhang(springz)

(Spring joined the Infrastructure team this week)

Martin Ohlson (martohls)

(Martin joined the Infrastructure team this week)

Progress:

  • Started to work on two bugs in Linaro Image Tools.
    • Pushed new branch for bug #651906 ('Should notify user that "apt-get" will be run in target rootfs') to Launchpad.
    • Pushed new branch for bug #673410 ('Replace "sfdisk -l" with "fdisk -l" to give more useful information') to Launchpad.

Issues:

  • Waiting for an Ubuntu installation for my ST-E computer; this is due to a slow IT process...
  • Can't test/verify implementation without a Linux machine.
  • Bazaar not able to contact Launchpad from within ST-E firewall; current solution is to branch, push, pull, ... from home.

Plans:

  • Work on ImproveLinaroMediaCreate, together with Guilherme.

  • To really enjoy working in this team :).

Ian Smith (ismith)

Progress:

  • Work on a consolidated report
  • Reviewing Infrastructure specifications
  • Helping with the conference calls
  • Working with IS on a couple of requests
  • Updating personnel "database"
  • Reporting
  • Assisting with Linaro IS requests
  • Chasing on the vostok renaming issue with Jono.
  • Looking into improving the running of projects

Issues:

Plans:

  • Reporting
  • Conference call assistance
  • Updating personnel "database"
  • Finishing hwpack licence (at last!)