Summary

Work Tracking

Team Work - Detailed

Paul Larson (plars)

Progress:

  • UDS discussions
  • Review current stakeholder proposals with James in preparation for stakeholder meeting
  • Got QEMU working with current images
  • Attempted to get imx51 image working with Babbage 2.0, which I now understand is probably not expected to work
  • Worked on scripts to determine if a new image is available on snapshots.linaro.org since the last time the script was run

Issues:

  • None

Plans:

  • Finish drafting specs for UDS
  • Review specs from others

James Westby (james_w)

Progress:

  • Almost entirely focused on the stakeholder meeting since UDS.
    • Completed that today, and started the handover of responsibility for running the process to Ian.

Issues:

  • None currently.

Plans:

  • Draft UDS specs.
  • Review UDS specs.
  • Help scope work for this month.
  • Further investigation of topics that are upcoming.

Zygmunt Krynicki (zyga)

Progress:

  • Getting over UDS-N
  • Drafting other-linaro-n-test-result-display-in-launch-control
  • Planning work for next month
  • Pushed lp:linaro-django-xmlrpc (Reusable XML-RPC application for Django projects) and lp:linaro-python-json (Common JSON utilities)

Plans:

  • Push draft for review to the mailing list
  • Figure out what to do with launch control release
  • Describe implementation plan for next month
  • Start working on graphing/charting for benchmarks
  • Start working on ubuntu-related features (modularization, packaging, ppa)

Issues:

Michael Hudson (mwhudson)

Progress:

  • Attended/recovered from UDS

Plans:

  • Move forward with OurOwnOffspring

    • Start arranging for hardware
    • Figure out exactly what the minimum set of things we need to do are
  • Write up UDS sessions

Issues:

  • Nothing in particular

Guilherme Salgado (salgado)

Progress:

  • Started catching up with email and drafting specs

Issues:

  • None currently.

Plans:

  • Draft specs.

Deepti Kalakeri (deepti)

Progress:

  • Started catching up with email and looking into the pybench
  • Attended the UDS

Issues:

  • None currently.

Plans:

  • Complete the pybench

Ian Smith (ismith)

Progress:

  • UDS
  • Work on a consolidated report
  • Looking at tools to facilitate tracking work items
  • Reporting
  • Assisting with Stakeholder process
  • Assisting with Linaro IS requests

Plans:

  • More of the same