Differences between revisions 1 and 2
Revision 1 as of 2013-02-13 14:16:24
Size: 3085
Editor: 70
Comment:
Revision 2 as of 2013-02-13 14:20:21
Size: 3181
Editor: 70
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
 || Sumit Semwal || sumit.semwal@linaro.org || sumits || Linaro Software Engineer || TI ||  || Sumit Semwal || sumit.semwal@linaro.org || sumits || Graphics Engineer || TI ||
 || Peter Ujfalusi || peter.ujfalusi@ti.com || || Audio Engineer || TI ||
Line 16: Line 17:
 * Goals for the month
 * Demo Status for Connect
Line 17: Line 20:
 * Goals for the month

Attendees

Agenda

Action Items

  • TBD

Action Items from Previous Meeting

  • Sumit to initiate email on the subject of a panel for use with a demo for CDF at LC. Goal is to show a panel that works with more than one member board.

Blueprints

WorkingGroups/Middleware/Graphics/Notes/2013-02-13 (last modified 2013-02-13 15:55:28)