Agenda

Past Action items

  • Last weeks action items to discuss.

Action Items

  • Action items that came out of this weeks meeting.


Engineers Reports

Zach Pfeffer <pfefferz>

Highlights

Plans

Issues

  • Your individual plans for the coming week(s).

Zygmunt Krynicki <zyga>

Highlights

Plans

  • Take some time off next week!

Issues

  • Working on ICS as JB builds were unstable. I've heard that JB builds should be fine now but I didn't have the need to switch just yet.

Patrik Ryd <patrikryd>

Highlights

  • Managed to build a mix of Linaro Android JB and internal source code for MALI support inside ST-Ericsson. Part of the Snowball JB BP.

  • "Fixed" the license problem in device/linaro/common. Change 2552 and change 2551 needs review and merge. Part of the Snowball JB BP.

Plans

Issues

  • No graphics support from the ST-Ericsson Snowball team until next week.
  • Need to fix wifi on my laptop since my 3G workaround have become a 2G workaround. :(

  • I don't have merge permissions in gerrit (but can +2). Have to wait for someone to merge patches.


Yongqin Liu <liuyq>

Highlights

  • Worked on the arm browser BP
  • submitted a cgi script to methanol repository
  • Tried to build AOSP sources

Plans

  • get the methanol test integrated into android-build

Issues

  • wait the review from doanac
  • need a cgi server on lava
  • staging on lava not support https access


Bernhard Rosenkraenzer <bero>

Highlights

  • Prepared for Linux Plumbers session on merging Android and regular Linux
  • Re-submitted perf patch to lkml
  • Looked at yaffs2 tools to figure out the best way to merge gnexus binaries post-build

Plans

  • Release script to merge gnexus binaries post-build
  • Trim down talk about merging Android and regular Linux for the Virtual Connect session
  • Extend talk about merging Android and regular Linux a bit for Plumbers (show some sample code)
  • Merge ICS patches that were omitted in the initial JB transition (strict-aliasing, ISO C++11)

Issues

  • None


Kejun Zhou <kejun-zhou>

Highlights

  • Fixed SD card partition missing issue and released patches for it.
  • Porting ECM to JB

Plans

  • Finish ECM porting before this Friday.

Issues

  • No


Vishal Bhoj <bhoj>

Highlights

  • Wifi is now enabled for panda and origen on JB.
  • benchmarks are now deployed for JB builds.
  • Clean up of scripts for benchmarks

Plans

  • get Benchmarks working on galaxy Nexus.
  • Compare the Benchmarks between ICS and JB for Panda.
  • Prepare presentation on android boot sequence.

Issues

  • None

Your Name <irc nick>

Highlights

  • Short bullet points of work you've done that week which convey

progress and highlights which can be used to report on how the team is progressing as a whole.

Plans

  • Your individual plans for the coming week(s).

Issues

  • Your individual plans for the coming week(s).


Android Team Meeting IRC log

Platform/Android/Meetings/2012-08-08 (last modified 2012-08-08 13:58:47)